Pages

Sunday, February 27, 2011

Sorry for the Lack of Updates.

I've been real busy with real life which cuts into my time to get online and ramble about the Bricklin's progress.  I apologize for that, but rest assured progress is being made (in fact, much more than this little snippet will attest to).

OK. A long day of work followed by a long day of working on the Bricklin.
1) Distributor cap and new spark plug wires done.

2) Installed new thermostat. The previous owner installed a 160 degree one (seriously?). Back up to 180.

3) Had to drill and tap some new paths for the radiator screws. The new ones are 5/16, except the bottom left (a fun surprise if the new owner has to change out the radiator, if I sell).

4) Plugged up the valves. Now, the air will only push the doors up; gravity will let them shut (I honestly don't know why the original plan was to have them pneumatically close...)

5) Went to NAPA to pick up belts. A warning to all - DON'T BLINDLY TRUST WHAT YOU REAL ON AN INTERNET FORUM. The belts I wrote down from the Bricklin Forum were completely wrong - I had to drive home to get the old ones to verify!

6) Ordered new radiator hoses while at NAPA. They'll be here Monday, hopefully with my new air compressor and Mazda Pulse Generator.

7) Installed new belts - Power Steering, A/C, and Alternator (Smog pump has been removed - no emissions for me). After that, it was time to call it a day.

Overall, the mechanicals are almost there. I just have to reinstall the radiator and fan, dial in the carb, and hunt down any vacuum leaks (which I'm sure will be plenty). Next week I'll finalize the pneumatic system and then it's back to the interior (and my Corbeau seats should ship "first thing next week" according to the seller)!

After that, we just wait for the body panels. Hopefully the entire thing will be done by the Summer.

No comments:

Post a Comment